project creatortrack public platform scoping 20260715T154038
name: CreatorTrack public-platform overhaul: scoping decisions locked 2026-07-15 description: URL migration is Phase 1/highest priority; Stripe Connect deferred; analytics captures max data now; consent/legal required. type: project
Justin locked scoping decisions for the CreatorTrack public-platform/analytics/funnels/pricing overhaul (handoff at ~/forge/memory/handoffs/creatortrack-public-platform-pricing-2026-07-15.md), targeting launch in ~3 months (by ~2026-10-15):
- URL migration = Phase 1, build first. No data loss required except gusthebass link-in-bio public pages must keep working; other legacy links (Justin's/Michael's) and workspace URLs are allowed to break.
- Stripe Connect (transaction fees) deferred. Build the plan/entitlement control layer per tier now; wire real payment collection/Connect later with clean seams.
- Analytics: capture everything now, pare down later. Split capture (must be complete/early, append-only, can't backfill) from dashboards (ship incrementally — core views for launch, defer A/B/CAPI/cross-channel/ad-imports as Pro/Scale upsells).
- Privacy/consent required, plus legal review before launch.
Why: this is a months-long, high-risk build (touches Stripe/billing, live public URLs already shared in the wild) and Justin wants max flexibility now with room to narrow later rather than re-litigating scope mid-build. How to apply: when picking up this project, defer to these scoping calls over the handoff's aspirational full pricing table; the handoff's scoping-decisions section is the source of truth for what to actually build in v1.
[auto-memory session 577603bc-d3a9-4b19-bb8e-6db80243b054, confidence 0.75, mode staged]